Ask an owner what one unit of a product costs to make, and the answer is usually the raw material plus "something for expenses". That something decides whether the product makes money. This guide shows what goes into the cost of one unit, why the usual ways of working it out mislead, and one small sum in rupees you can copy for your own product.
What goes into the cost of one unit
Five things. All five are inside every unit you sell, whether or not anyone has written them down.
- Raw material, at today's rate. What the unit is made of, waste included, priced at your latest bill and not last year's.
- Machine time. The hours the product kept a machine busy. Machine hours are what a factory runs out of, so they are the fairest way to share the costs below.
- Power. What the machine draws while it runs, at your tariff.
- Labour. The pay of the people who ran those machines for those hours.
- The month's overheads. Rent, office salaries, interest, depreciation, repairs. Nobody bills them to a product, so they have to be shared out.
Raw material is the easy one, because it is on the bill. It is usually only half to two-thirds of the real cost.
Why the usual costing methods mislead
A cost sheet made once a year
Most cost sheets are made when a product is first quoted, and opened again when a customer asks for a new price. In between, rates, wages and the tariff all move. The sheet does not.
Raw material at an old rate
If the rate went up 8% three weeks ago and the bill has not been entered, every quote since then is built on a price you can no longer buy at.
Overhead spread by guesswork
"Add 20% for expenses" is a common rule. It charges the same share to a product that runs fast and to one that sits on the machine all day. The slow product looks cheaper than it is, so you quote it low and sell more of it.
Production typed in from a shift sheet
Cost per unit is a division, and the bottom number is how many units were made. If that comes from a sheet filled in at the end of a shift, partly from memory, every cost above it is divided by a guess.
A worked example: one product, one month
Take a factory of 30 machines. One product ran on three of them for 400 hours each last month, which is 1,200 machine hours. The machines measured 40,000 units.
The month's sum for this product
- Raw material: 1,600 kg at ₹150 a kg = ₹2,40,000
- Power: 1,200 hours × 3 kW = 3,600 kWh, at ₹10 = ₹36,000
- Labour: two operators at ₹18,000 = ₹36,000
- Overheads: ₹7,50,000 for the month, over the 15,000 machine hours the whole factory ran, is ₹50 an hour. 1,200 hours × ₹50 = ₹60,000
- Total: ₹3,72,000. Divided by 40,000 units = ₹9.30 a unit
Per unit, that is ₹6.00 of raw material, ₹0.90 of power, ₹0.90 of labour and ₹1.50 of overheads.
Now the old cost sheet for the same product. It has raw material at last year's ₹135 a kg, which is ₹5.40 a unit, plus 20% for expenses: ₹6.48. The product sells at ₹8.50. The sheet says it earns ₹2.02 a unit. The real sum says it loses ₹0.80 a unit, which is ₹32,000 in the month.
And if the shift sheet had said 43,000 units when the machines made 40,000? The same ₹3,72,000 would come to about ₹8.65 a unit. Three thousand units that were never made would hide most of the loss.
How to do the sum for your own product
- Pick one product and one month.
- Add up the raw material it used, at the rate on your latest bill.
- Find the hours it ran. Multiply by what the machine draws and by your tariff.
- Add the pay of the people who ran it.
- Divide the month's overheads by all the machine hours the factory ran. Multiply by this product's hours.
- Add the four and divide by the units made.
The arithmetic is not the hard part. The hard part is two numbers: hours run and units made. On paper, those are the two nobody would swear to.
What changes when output is measured at the machine
- The bottom number is real. Units made come from the machine, not from memory.
- The hours are real. Run time is what power, labour and overheads are shared by, so the slow product carries its own share.
- The sum can be done every day. A yearly cost sheet tells you what a product cost once. A daily one tells you the week it stopped paying.
This is the sum Blitz does. The machine tells it what was made. You say once what goes into a product and what your month costs to run. From then on every unit is costed every day, with overheads read from your Tally books. Blitz reads Tally and never writes to it. If an input is missing, the figure stays blank and names what is missing. See true cost per unit and production tracking, or look up a term in the glossary.
The short version
Cost per unit is five costs divided by the units made. Use this month's rates, share overheads by machine hours, and divide by output that was measured. Then ask what your stopped hours cost: what machine downtime costs, and what research says.