The number your factory is built on

Know your true cost per unit, live.

Material, energy, labour and overhead, added up on every unit while the day is still running. Price a job knowing what it costs you, and see which products, which customers and which machine-hours are the ones actually paying you.

blitz · product cost · live
Cost by product · this week
25 mm woven elastic
₹33.60 / unit
material ₹20.50energy ₹3.36labour ₹6.04overhead ₹3.70
40 mm PP webbing
₹27.08 / unit
material ₹18.41energy ₹1.76labour ₹4.06overhead ₹2.85
12 mm braided cord
₹17.30 / unit
material ₹8.30energy ₹3.20labour ₹3.46overhead ₹2.34

Labour comes from attendance: absent workers are excluded from the pools automatically.

The Product Cost report: every product, costed live.

What the number lets you do

Price with confidence. Run what pays. Drop what doesn't.

True cost per unit is not a report you read once. It is the number four decisions hang off: the price you quote, the products you keep, the customers you chase, and the job you put on the machine next. Blitz puts it in front of you while all four are still yours to make.

Price from the number, not from feel

Quote against what the job actually costs you, with the margin in front of you while the customer is still on the phone. You stop finding out at year-end what a price was really worth.

Profit per machine-hour

Rank what to run next by what each product earns per hour of the machine it needs. Machine-hours are the thing you actually run out of, and this is a scheduling decision you could not make at all before.

Profit per product

Selling price minus true cost, line by line. See which products carry the factory and which you've been running at a loss, and fix it.

Profit per customer

The same true cost, rolled up by who you sell to. Your biggest order isn't always your best payer. Now you know which is which.

The floor stops being a black box and tells you plainly where you make money and where you leak it. And you do not have to come looking: Jarvis pushes you the one that moved. See why owners switch or browse the full feature set.

Why it matters

Most factories track material cost and quietly lose money on the rest.

Material is the easy number: it's on the bill. But it's only half to two-thirds of true cost. Energy, labour and overhead are the rest, and they leak from your margin every time you don't count them.

True cost adds all four the moment a run ends. Every unit your machines make and every bill captured at the gate flows into this one number, and it rolls up into profit per product and per customer. You are not waiting for a month to close to find out which is which.

01

Material

Exactly what each run consumed, deducted at your real bill price.

02

Energy

What each machine actually drew, costed at your tariff.

03

Labour

Operator and shift cost, shared across the units they actually ran.

04

Overhead

Rent, salaries, interest, depreciation: read out of your own ledger, split by the machine time a product actually used.

Who does what

Four costs, one number. And the arithmetic runs itself.

The machine tells us what was made. You tell us once what goes into a product and what your month costs to run. From then on the arithmetic runs itself, every unit, every day.

Blitz reads output and run-time from each machine, takes material rates off the bills photographed at the gate, and splits energy, labour and overhead across the units made. Nobody adds a cost up at month-end, because there is nothing left to add up.

Jarvis keeps an eye on this number for you. When a product's cost per unit moves against you, it tells you. You do not have to be on the page to find out.

See how it works
Product A · true cost
per unit
Material / unit₹34.00
Energy / unit₹6.00
Labour / unit₹10.00
Overhead / unit₹7.00
True cost / unit₹57.00

Material is only ₹34 of a ₹57 unit. Price off material alone and ₹23 a unit walks out the door, quietly, on every single piece.

The objection nobody answers

"My cost is only as good as the rate on the bill, and my bills reach the computer three weeks late."

That is the right objection, and it defeats most costing software. Measuring the machine side perfectly is worth very little if the money side is running on last month's rates.

So Blitz reads the bill the day it arrives. A supplier bill at the gate or a customer PO on WhatsApp is photographed, read, checked and saved that day, which means the rate behind your cost per unit is as current as the output behind it. We call the alternative stale-rate costing, and it is the most common reason an owner's cost per unit is confidently wrong.

01 · PAPER

The bill arrives

Photographed and read the same day, not retyped a fortnight later. You check the filled-in form and save it.

02 · RATE

The rate lands live

It goes into the same stock pool your machines draw from, so what you actually paid this week is what your costing uses this week.

03 · COST

Both halves are current

Sensor-measured output, priced at this week's real rate. Neither half is a guess, and neither half is stale.

See how Blitz reads your paperwork, and why a misread never reaches your costing.

Where the overhead comes from

Your accountant's own figures, in the cost of every unit.

Most costing asks you to estimate your overhead, so the answer is only ever as good as the guess. Blitz does not ask. Rent, salaries, interest, depreciation: the figures are already sitting in the Tally ledger your accountant keeps every month, and Blitz reads them from there.

You sort those headings into buckets once. From then on the month's real overhead is carried into every unit that comes off the floor, from the same books your CA files from. It is not a second set of numbers to keep in step with the first.

01 · READ

From the ledger, not from memory

The headings your accountant already maintains. Nobody retypes a figure into a costing sheet, and nobody has to remember to.

02 · MAPPED

Into buckets you set once

Which headings belong to the factory is your call, made once and left alone. You revisit it when the business changes, not when the month ends.

03 · SPLIT

By machine time actually used

Not spread over how much came off the floor, so the machine that ran slow and long carries its own share instead of the fast one's. February carries all of February, not 92.3% of it.

Blitz reads your Tally books. It never writes to them.

Set up once, with us

Seven things we set up with you, once.

Here is the whole list, in front of you rather than discovered in week three. We sit with you and do it, most of it takes an afternoon, none of it comes back next month, and after that nobody types a cost again.

01 · RECIPE

What goes into one unit

For each product, what it is made of and how much. A product with a blank recipe is flagged as incomplete and left out of costing. Nothing is assumed to fill the gap.

02 · RATES

The first bill for each material

Read from the photo, then checked and approved by a person. After that every new bill at the gate updates the rate on its own, and that is the rate your costing uses.

03 · OVERHEAD

Which ledger headings are factory

Your accountant's headings, sorted once into buckets you name. Rent and salaries are in. The car loan is not. You decide which is which, and you decide it once.

04 · POWER

Your tariff, and one reading per machine

Somebody clamps a meter on each machine once and we store what it draws. After that every second the machine runs is priced at your tariff.

05 · SHIFTS

Your shifts, and what they cost

Shift timings and pay, typed as rows, not written into the software. Attendance itself comes from whatever you already use: the box on the wall, a cloud service, or your office's spreadsheet.

06 · FORMULA

The sum, where a machine is not counting

Some machines count each piece. Others report how long they ran, and output is worked out from a line of arithmetic you type in your own terms. Every row says which of the two it came from.

07 · WHAT IS ON IT

Which item is running on which machine

The one thing the floor supplies every day, and it takes seconds. Got it wrong? You restamp the window. The history is not edited: the correction is recorded against it.

Six of those seven are settings, not chores. Number seven is the only one anyone touches again, and the machine carries the rest of the day on its own.

Until one of the seven is in, Blitz says so rather than guessing. The figure comes back blank and names what is missing, and the total goes blank with it. A machine nobody has measured for power is named and left out, not quietly averaged in. A zero says it was free. A blank says we don't know yet.

That is why a figure on this screen is one you can price against the day it appears, and one you can put in front of a customer.

Product B · true cost
per unit
Material / unit₹34.00
Energy / unitblankLOOM 04 has no power figure
Labour / unit₹10.00
Overhead / unit₹7.00
True cost / unitblank

Three of the four are known. The total still refuses, because ₹51 would be a lie you could price against.

True cost per unit, answered.

What is true cost per unit?

True cost per unit is the all-in cost of making one unit of product: not just the raw material, but material, energy, labour and overhead added together. It's the number you need to price correctly and to know whether a product, and a customer, actually makes you money.

How do you calculate true cost per unit?

The machine tells us what was made. You tell us once what goes into a product and what your month costs to run. From then on the arithmetic runs itself, every unit, every day. Blitz reads output and run-time straight from each machine, takes material rates from supplier bills photographed at the gate, and splits energy, labour and overhead across the units produced.

What do I have to set up before a cost appears?

Seven things, and you do them once, with us, not every month: the recipe for each product; the first supplier bill for each material, checked and approved by a person; which headings in your ledger are factory overhead; your electricity tariff and one meter reading per machine; your shift timings, what they cost and where attendance comes from; the output formula for any machine that is not counting pulses; and which item is running on which machine. The full list is on this page, so nobody has to discover it in week three.

What happens if an input is missing?

The figure comes back blank and names what is missing, and the total goes blank with it. Blitz will not put a zero or an average in the gap. A machine nobody has measured for power is named and left out, not quietly averaged in. A zero says it was free. A blank says we don't know yet.

Is the cost per unit real-time?

Yes. The moment a machine stops a run, Blitz deducts what was used and updates the cost. You see the true cost per unit for today, this shift and this product as it happens, not at month-end when the month is already gone. Jarvis can tell you the number out loud the moment you ask.

Why does tracking only material cost lose money?

Material is usually only half to two-thirds of the real cost. Energy, labour and overhead make up the rest, and they vary by machine, speed and shift. If you price off material alone, the difference quietly comes out of your margin on every single unit, and you never see it until the year-end accounts, when it's already gone.

All questions answered

See your true cost per unit, live.

Book a 20-minute demo. Bring a product you're unsure about, and we'll show you what it truly costs, on your own floor. We set it up for you.