Narrow fabric & webbing

Elastic, webbing and tape: tracked per head, costed per meter.

Our home turf: Blitz was born on a narrow-fabric floor. A sensor on every covering, warping and loom machine turns your floor into an agent: per-head meters, true cost per quality, and nobody typing production.

The problem

Many heads, many qualities, no real numbers.

One loom, several heads, every head on a different quality. By the time a register adds up the meters (if it ever does), the run is gone and the number is a guess. You price and plan blind.

1

How many meters did Head 2 on Loom 6 run last night?

2

What does one meter of this elastic truly cost, all-in?

3

How much thread and rubber did we really consume versus the recipe?

4

Which quality (webbing, tape or elastic) is actually carrying the floor?

Head-level output, automatic stock

Every head reports its own meters.

A separate figure per head, not one blurred machine total. When a run stops, the thread and rubber it used are deducted automatically against that head's quality, so stock stays live and correct.

  • Per-head output on covering, warping and loom machines
  • Thread and rubber deducted to the meter, per quality
  • No operator writes a single number down
  • Plan each job against its order, and track plan vs. actual live
Loom 6
LIVE · running
Loom 6 · Head 1running
Loom 6 · Head 2running
Meters today1,860 m
Cost / meter · elastic₹3.12

Price every quality from its real cost

Quote each width and quality from fact, not feel.

Each quality carries its own recipe, so Blitz sums thread, rubber, energy, labour and overhead per meter run. Quote a new width from true cost, not gut feel, with material intake keeping every rate current.

How true cost per meter works
Thread / meter₹1.52
Rubber / meter₹0.84
Energy / meter₹0.14
Labour / meter₹0.36
Overhead / meter₹0.26
True cost / meter · elastic₹3.12

Figures shown for illustration. Blitz builds yours from your own runs. Meters are measured gross per head and reconciled at rolling; quality stays your call.

Configuration, not code

It runs the way your factory runs, and you are the one who changes it.

Your shifts, the words you use for the positions on a machine, what a product is measured by, even the sum that turns machine time into output: you set every one of them yourself, and you change any of them the morning the factory changes. No ticket to raise, no consultant to book, no waiting on us. That is why it fits a trade nobody wrote it for.

1

Your shifts are rows you type. Two, three, or a short one on Saturday, with your own start and end times.

2

What you call the positions on a machine is a word you choose, and it is the word on every screen after that.

3

What a product is measured by, you declare. Blitz then never adds two different measures together.

4

The sum that turns machine time into output is a line of arithmetic you type into a box. You can read it, and you can correct it.

New work

Price the job you have never made.

A customer rings and asks for something you have never run. Today you quote from feel, or you pass. Tell Blitz the raw material in one unit and how fast your machines would make it. It prices the machine time at what an hour on those machines costs you, from your own record, then adds packing, transport and your margin.

Or simply ask Jarvis for the price, while he is still on the phone.

How quoting new work works
Quoting a product you have never run
Raw material in one unityou say
How fast your machines would make ityou say
What an hour on those machines costsmeasured
Packing, transport and your marginadded
Your price, with your margin in itwhile he is on the phone

The hourly cost in that price comes from what your machines ran and what they cost, so you can quote him on the call and stand behind it afterwards. Where an input is missing, Blitz names it rather than pricing around it.

Narrow-fabric owners ask us these first.

Can Blitz track production per head?

Yes. Blitz tracks output down to each head on a loom, not just the machine. Every head reports the meters it ran and the quality it was making, so a 6-head loom gives you six separate production figures, automatically.

Does it handle elastic, webbing and tape?

Yes. Elastic, webbing and tape are all standard. Each quality carries its own recipe (picks, thread and rubber per meter), so Blitz measures output in meters and costs each quality on its own real numbers, across covering, warping and loom machines.

How is rubber and thread stock kept accurate?

Every run deducts exactly the thread and rubber it used the moment a machine stops, based on the quality each head was making. Raw-material bills are captured at the gate from a photo of the bill as they arrive. So thread and rubber stock stay live and correct, with a full trail and no month-end counting.

Will it work on my existing machines?

Yes. A small sensor goes on each covering, warping or loom machine in minutes, on any machine, old or new. Nothing stops, nothing gets rewired, and there is no downtime.

All questions answered

See your floor, head by head.

Book a 20-minute demo. Bring your hardest quality to cost, and we'll show the meters and true cost per meter live. We set it up for you.