Injection moulding

Every cycle measured. Every mould change timed. True cost per piece.

Blitz puts a sensor on each moulding machine, from the 90-tonne to the 450-tonne. You see the cycles it ran, the minutes it stood, and what a piece costs at today's resin rate.

Hydraulic, servo or all-electric · any make, any tonnage · the operator confirms the piece count

Where the margin goes

The shift sheet says 7,000 pieces. It does not say what they cost.

A moulding shop loses money in small ways. A mould change planned for one hour takes three. An eight-cavity mould runs with one cavity blocked. Someone adds three seconds of cooling to a 24-second cycle, and one piece in nine is gone. The shift sheet shows none of it.

1

How many cycles did Machine 7 run last night, and on how many cavities?

2

How long was Machine 4 down for the mould change and the colour change?

3

If PP moves ₹15 a kg, an 80 g piece costs ₹1.20 more. Which of your quotes still hold?

4

Which mould, on which machine, makes money, and which only keeps the machine busy?

On the machine, not on paper

Each moulding machine reports its own cycles.

A sensor goes on each machine, whatever its make or age. Blitz sees when it is cycling and when it has stopped, and measures every cycle. Pieces are cycles times the cavities running, and your operator confirms that figure, so a blocked cavity is on the record. Plan each machine to its order and watch plan against actual.

A mould change, a blocked nozzle, a wait for dried material: the stop shows the minute it starts. Jarvis tells you while the machine is still down, not at the next morning's production meeting.

Moulding floor
LIVE
M-4 · 180 T · 2-cavity containerrunning
M-7 · mould changestopped 42m
M-4 today · 3,240 cycles × 26,480 pcs
Cost / piece₹14.60

The number behind every quote

Cost per piece, by mould and by machine.

Resin and masterbatch, power, labour and overhead, added up against the hours the machine really ran. The same mould costs more per piece on a bigger machine. Blitz shows by how much.

Material intake reads the supplier bill at your gate, so when PP or ABS moves, the cost per piece moves with it. No rate typed in from memory.

How the cost of a piece adds up
PP and masterbatch / piece₹12.80
Power / piece₹0.70
Labour / piece₹0.45
Overhead / piece₹0.65
True cost / piece₹14.60

Illustration: an 80 g PP container, two cavities, 180-tonne machine, PP at ₹155 a kg. Blitz works yours out from the runs you make. Cycles are measured at the machine and pieces confirmed by your operator; rejects, regrind and quality stay your call.

Fitted while the shop runs

No mould comes down, and you are live the same day.

No consultant and nothing wired into the controller. We set it up for you, on a twenty-year-old hydraulic machine and a new servo alike. See why owners choose Blitz.

Consideration
Big MES / ERP
Blitz
Getting started
Months
Live in a day
Cost
Many lakhs upfront
A fraction
Old hydraulic machines
Often unsupported
Report like the new ones
Cycles run
From the shift sheet
Measured as they happen

You set it, not us

Set up the way your moulding shop runs, and yours to change.

Shifts, cavities, pieces or kilos, and the sum that turns cycles into pieces: each is a setting, and you change it the morning the shop changes. A new mould, a third shift, a job sold by weight. None of it waits on us.

1

Your shifts are rows you type: two of twelve hours, or three of eight, with your own start times.

2

You call the positions in a mould cavities. Blitz uses your word on every screen.

3

You say what each product is measured by: pieces for a cap, kilos for a job sold by weight. Blitz never adds the two.

4

Cycles times cavities is a line of arithmetic you can read. Block a cavity, and you correct it yourself.

If a piece is moulded, then printed, then assembled, you set that route once. Every job on it carries its cost through each step.

A new enquiry

A firm rate for a mould you have never run.

A buyer sends a drawing and wants a rate per piece by evening. Tell Blitz the resin in one piece, runner included, and how many pieces an hour the mould should give. Blitz takes the hourly cost of that machine from your own record, then adds packing, transport and your margin.

Or ask Jarvis, while the buyer is still on the line.

See how a new job is priced
A piece you have never moulded
Resin in one piece, runner includedyou say
Pieces an hour from that mouldyou say
Hourly cost of that machinemeasured
Packing and transport, then your marginadded
Your rate per piece, margin includedbefore he hangs up

The hourly cost comes from what your machines ran and what you paid, so you can stand behind the rate later. If an input is missing, Blitz says which one. It does not guess.

What moulders ask us first.

How does Blitz know how many pieces a moulding machine made?

A sensor on the machine measures every cycle. Blitz multiplies the cycles by the cavities running, and your operator confirms the figure, so a blocked cavity is on the record. You still get running time, energy and true cost per piece for every machine.

Will it work on old hydraulic machines as well as servo and all-electric?

Yes. Any make, any tonnage, any age. The sensor sits outside the machine, so nothing is wired into the controller and no mould comes down. A twenty-year-old hydraulic machine reports the same way as a new all-electric one.

How is the true cost per piece worked out?

Blitz adds the resin and masterbatch in the piece at the rate on your supplier bills, the power for the time the machine really ran, labour, and a share of overhead. Material intake reads each bill at the gate, so when the PP rate moves, your cost per piece moves with it.

Does Blitz track rejects, short shots and regrind?

No. Blitz measures the machine: cycles, running time, stops and energy. Rejects, flash, short shots and regrind stay your call, and your operator confirms the piece count. You get the hours each machine lost and the true cost of its pieces.

All questions answered

See what your moulds really earn.

Book a 20-minute demo. Put it on a few machines and compare a week of measured cycles with your shift sheets.