CNC & precision machining

Know what every CNC actually ran, and what each job truly cost.

Live spindle utilisation, every idle minute caught, and true cost & profit per job and per customer, on every machine, old or new. No operator logbook. We set it up for you.

Any CNC, any age, any make · live from anywhere · no machine tap

The problem

Your spindles bill by the hour, but you can't see the hours.

A job shop lives and dies on machine-hours, yet most run on memory and a quote built from a gut-feel rate. Half your spindle time can quietly disappear into setups, waiting and idle, and you only find out when the job loses money.

1

How many hours did each machine actually cut last shift, versus sit idle?

2

What did this job truly cost: material, the machine-hours it really took, labour and overhead?

3

Which customers and part numbers actually make money, and which you should reprice?

4

Is your real spindle utilisation 70% like you think, or closer to 30%?

Every machine reports itself

Put it on each machine. Then the shop reports itself.

Fitted in minutes: nothing wired in, no machine tapped, no licence. Blitz reads when each CNC is genuinely cutting versus idle, and turns those machine-hours into true cost and profit per job and per customer.

That's Blitz, the floor platform. It captures your material bills at the gate too, and Jarvis flags a machine the moment it sits idle.

  • Live spindle utilisation: cutting vs idle, per machine
  • Every stop and idle minute caught and timed automatically
  • True cost & profit per job and per customer
  • Energy drawn per job, priced into the quote instead of buried in the monthly bill
blitz · machine shop
Shop floor · live
LIVE
VMC 3cutting
CNC lathe 2idle 23m
Utilisation today
0%
▲ live
Cost / job · #4180
₹0
all-in
Jarvis 14:38
CNC lathe 2 has been idle 23 minutes mid-shift, the longest stoppage today. Want me to flag the supervisor?
Yes. And what's its utilisation this week?

Jarvis

Be told when a machine sits idle, not at the weekly review.

The agent ACTS and SPEAKS. When a machine goes quiet mid-shift, Jarvis messages you. Ask it which customer was most profitable this month, and it answers in plain language, and briefs you each morning.

See what Jarvis can do

The number that decides your quote

₹0

True cost per job: by part, by machine, by customer.

Material, energy, labour and overhead, added up against the machine-hours each job actually used, not a flat shop rate. Quote from your real number, and see which customers quietly cost you money.

How true cost works
Job #4180 · 250 pcs18% margin
Material₹8,100
Machine-hours × rate₹5,760
Labour₹1,620
Overhead₹1,100
True cost / job₹16,580

Figures shown for illustration. Blitz builds yours from your own jobs. Run-time and energy are measured at the machine; part counts are confirmed per job, never guessed.

Configuration, not code

It runs the way your factory runs, and you are the one who changes it.

Your shifts, the words you use for the positions on a machine, what a product is measured by, even the sum that turns machine time into output: you set every one of them yourself, and you change any of them the morning the factory changes. No ticket to raise, no consultant to book, no waiting on us. That is why it fits a trade nobody wrote it for.

1

Your shifts are rows you type. Two, three, or a short one on Saturday, with your own start and end times.

2

What you call the positions on a machine is a word you choose, and it is the word on every screen after that.

3

What a product is measured by, you declare. Blitz then never adds two different measures together.

4

The sum that turns machine time into output is a line of arithmetic you type into a box. You can read it, and you can correct it.

If a product passes through four machines, that route is something you set once, and every job that runs it afterwards carries its true cost through all four, machine by machine. A machine you have not placed yet waits to be placed rather than being guessed at from its name.

New work

Price the job you have never made.

A customer rings and asks for something you have never run. Today you quote from feel, or you pass. Tell Blitz the raw material in one unit and how fast your machines would make it. It prices the machine time at what an hour on those machines costs you, from your own record, then adds packing, transport and your margin.

Or simply ask Jarvis for the price, while he is still on the phone.

How quoting new work works
Quoting a product you have never run
Raw material in one unityou say
How fast your machines would make ityou say
What an hour on those machines costsmeasured
Packing, transport and your marginadded
Your price, with your margin in itwhile he is on the phone

The hourly cost in that price comes from what your machines ran and what they cost, so you can quote him on the call and stand behind it afterwards. Where an input is missing, Blitz names it rather than pricing around it.

Questions machine-shop owners ask first.

What does Blitz measure on a CNC machine?

Live spindle utilisation (when each machine is genuinely cutting versus idle or stopped), downtime and its length, and real energy per machine. It works on any control, old or new, with nothing wired in. From those machine-hours Blitz builds true cost and profit per job and per customer.

Does it count my parts?

We measure run-time and true cost, not a guess at piece count. A job shop runs a different program for every part, so exact quantities are confirmed per job by your operator or your existing count. What you get automatically and reliably is utilisation, downtime, energy and true cost per job.

Will it work on my older or imported machines?

Yes. Blitz stays outside the machine, so it works on the oldest controller and the cheapest imported one exactly like the newest: no machine tap, no licence, no IT project. If a machine runs, Blitz can give it a voice.

How does it tell me which jobs make money?

Blitz puts material, energy, labour and overhead against the machine-hours each job actually used, and gives you true cost and margin per job and per customer, so you quote from real numbers and stop running work that quietly loses money. See how true cost works.

All questions answered

See your real machine-hours.

Book a 20-minute demo. Bring one machine and one job. We'll show its true utilisation and cost live. We set it up for you.