Building materials

Every stroke of the press measured. Every piece costed.

Pavers, blocks and tiles come off the press several to a stroke, then cure in the yard for two weeks or more. Blitz measures the pieces at each press, times every stop and works out what one piece cost you.

Paver, block and tile presses · AAC cutting lines · no operator entry

The problem

The shift book says full output. The cement store disagrees.

A press that waited an hour for pallets shows the same shift total as one that never stopped. Colour pavers run slower than plain grey, yet both are quoted off one rate. Cement moves ₹10 a bag and the price per piece stays put. Two or three in a hundred break before loading.

1

How many pieces did Press 2 really press on the day shift?

2

How long did it stand for a mould change, for empty pallets, for the mixer?

3

What does one 60 mm grey paver cost me today in cement, power and labour?

4

Which shape and colour pays, and which one only keeps the press busy?

At the press

Each press tells you what it made, stroke by stroke.

A small sensor goes on each paver, block or tile press, and on the cutting line of an AAC plant. You set how many pieces one stroke of each mould makes, and Blitz turns strokes into pieces by press, shift and operator. Give a press its order and target, and watch plan against actual.

When a press stands for a mould change, for pallets or for mix, you see it standing and for how long. Jarvis tells you while it is still down.

Paver and block shed
LIVE
P-1 · zigzag paver 60 mmrunning
P-2 · mould changestopped 22m
Pieces today14,400
Cost / piece₹7.50

What a piece really costs

Cost per piece, by shape and colour, by press.

Cement, dust, aggregate and pigment, power, labour and a share of overhead, for one piece. A grey 60 mm paver sells near ₹9.50. At a cost of ₹7.50 you keep ₹2, and less after a slow shift or a dearer cement load.

Material intake reads the cement, dust and pigment bills at the gate, so the rate in your cost is the one you paid, not last season's guess.

How true cost per piece works
Cement & aggregate / piece₹6.10
Energy / piece₹0.25
Labour / piece₹0.65
Overhead / piece₹0.50
True cost / piece₹7.50

An example for a grey 60 mm paver, not your figures. Pieces are measured gross at the press and reconciled to your yard count. Curing, kiln and autoclave loads are batch steps you confirm.

Fitted without stopping a press

A big-plant view of your presses, without a big-plant project.

No consultant for months and no press stopped for wiring. We set it up for you and you read numbers the same day, on any press. Read why Blitz is built this way.

Consideration
Big MES / ERP
Blitz
Installation
Months
Live in a day
Cost
Many lakhs upfront
A fraction
Old / mixed presses
Often unsupported
Works with any
Your numbers
Typed in, late
Measured, live

Configuration, not code

Your moulds, your shifts, your words. You set them, and you change them.

A new mould arrives, a shift moves for the summer, a product starts selling by the square foot. You change the setting yourself that morning, with no ticket and no visit from us.

1

Shifts are rows you type: one long day shift, or two in season, with your own start and end times.

2

Call the positions on a press cavities, or whatever your operators say. Every screen uses that word.

3

Pavers by the piece, tiles by the box, AAC by the cubic meter. You declare the measure, and Blitz never adds one to another.

4

One stroke of this mould is eight pavers. That sum is a line you type, and you correct it when the mould changes.

New work

Quote a shape you have never pressed.

A contractor asks for an 80 mm paver in a shape you have never made. Today you guess, or copy the next yard's rate. Tell Blitz the mix in one piece and how many an hour your press would make. It prices the press time at what an hour on that press costs you, from your own record, then adds packing, transport and your margin.

Or ask Jarvis for the rate while the contractor is still on the line.

How Blitz prices a new shape
Quoting a paver you have never made
Mix that goes into one pieceyou say
Pieces an hour on your pressyou say
What an hour on that press costsmeasured
Packing, transport, then your marginadded
A rate per piece you can holdon the same call

The press-hour cost in that rate comes from your own running record and bills, so you can defend it when he bargains. If something is missing, a pigment rate for example, Blitz says so and does not guess.

Questions paver, block and tile makers ask.

How does Blitz know how many pavers or blocks a press made?

A small sensor on the press picks up every stroke. You tell Blitz once how many pieces a stroke of each mould makes, and it turns strokes into pieces for every press and shift. The total is gross as pressed, and you reconcile it to your yard count.

Which building-material machines does it measure?

Paver and block presses, tile presses and the cutting line of an AAC plant, of any make or age, with no rewiring. Batching and mixing before the press, and curing, kiln and autoclave after it, are not measured. Those are batch steps you confirm.

What goes into the cost of one piece?

The cement, fly ash, dust, aggregate and pigment in the piece at the rates on your own bills, the energy the press used while it ran, the labour and a share of overhead. Material intake reads the bills at the gate, so when cement moves by ₹10 a bag your cost per piece moves with it.

Will it work on a fifteen-year-old press with no PLC?

Yes. The sensor sits on the outside of the press and takes minutes to fit. Nothing is cut, rewired or reprogrammed. An old hydraulic press and a new automatic plant report the same way, on one screen.

All questions answered

See your press floor as it is.

Book a 20-minute demo. Put it on a few presses and set the measured pieces beside your shift book.