The work you never had time to go and get
Price the job you have never made.
A customer rings and asks for something you have never run. Today you quote from feel, or you tell him you will call back and the enquiry goes cold. Tell Blitz the raw material and how fast your machines would make it. It knows what an hour on each machine costs you, and gives you the price while he is still on the phone.
Each machine's hourly cost is its power, wages and overheads over the hours it really ran.
Why it matters
There are two ways to answer a new enquiry, and both of them cost you.
You can quote from feel. You add a bit for the unfamiliar, the customer takes it, and you find out eleven months later that the job was carrying the factory in the wrong direction the whole time. Or you can tell him you will work it out and call back, and by the time you have, he has a price from somebody else.
This is the only page on this site about work you are not doing yet. Everything else here is about running the factory you already have. This one is about the orders you have been turning away because the arithmetic took three days.
Two things from you
The raw material that goes into one unit, and how many units an hour each machine or step would make.
What a machine hour costs
Blitz already knows it for each machine, from your own record. Not a rate card, not an estimate somebody kept in a book.
Hourly cost ÷ units an hour
That is the machine cost of one unit. A job that passes through several machines or steps is priced at each one.
Material, packing, margin
Add the raw material, then packing and transport, then your margin on the whole cost, not on the material.
Where the number comes from
Your figures, and hours your machines really ran.
A new product has no history of its own, but your machines do. Blitz knows what an hour on each one costs: its power, wages and overheads, over the hours it really ran. Divide that by the units an hour the new job would make, and you have its machine cost per unit.
Add the raw material that goes into one unit, then packing and transport, then your margin. A job that passes through several machines or steps is priced at each one. The hourly costs are the same ones behind your true cost per unit, pointed at a product that does not exist yet.
See how it worksYou gave the material, the speeds and the margin. The rest is your own record.
Why you can send the price
Call him back within the hour with a number you can hold to.
The price is made of things you can check. The raw material and the speeds are what you gave. What an hour on each machine costs comes from your own record. Each part is on the screen: material, every machine or step, packing and transport, margin.
Where an input is missing, Blitz names it rather than pricing around it. You get a blank and the sentence that says what was missing (not a wide range, not a number with a warning under it), the same way a missing material price leaves the cost per unit blank rather than quietly calling it zero. A guess that reads like a quote is worse than no quote: you cannot un-send a price.
So an enquiry you would once have passed on becomes an hour's work and an order you can win.
A price, and where each part of it came from
Material, each machine or step, packing and transport, and margin, each on its own line. The hourly costs are the ones your costing already uses.
Blank, and what it would take to fill it
A machine with no hourly cost yet, or a setting left empty. It names which, so you know what to go and fix before you send a price.
Why by the machine hour
Costs are spent by the hour. Products differ by how fast they run.
A machine costing ₹120 an hour makes a fast product for a couple of rupees a unit and a slow one for several times that. A flat average hides it, so Blitz prices each job by the machine hours it would take.
What goes into the hour
The machine's power, wages and overheads, over the hours it really ran.
Fast product, slow product
At ₹120 an hour, 50 units an hour is ₹2.40 a unit. 10 units an hour is ₹12: the same machine, five times the cost.
Ask Jarvis for the price
Jarvis is the part of Blitz that talks to you. Ask it for the price and it works it out from the same figures.
The hours behind this are your own, read straight from each machine. See how machines and positions are set up.
And the call that never came
Pricing a new job is worth more when there are new jobs to price.
Quoting well only pays if the phone rings. Blitz also finds firms that buy what you make, leaves out the ones you already deal with, writes the first email in your own words, sends it, and keeps a note of who you wrote to and when, so twenty enquiries do not become twenty evenings. The same search works the other way, for a cheaper supplier.
Quoting new work, answered.
Can Blitz price a product I have never made?
Yes. You give two things: the raw material that goes into one unit, and how fast your machines would make it, for each machine or step the job passes through. Blitz already knows what an hour on each machine costs you, so it works out the machine cost of one unit, adds the material, packing and transport, then the margin you set.
Where does the price actually come from?
From your own record and what you tell it. An hour on each machine costs its power, wages and overheads over the hours it really ran, not a rate card. Divide that by the units an hour the job would make and you have the machine cost of one unit. Then the raw material, packing and transport, and your margin.
What if something it needs is missing?
Then Blitz says so. Where an input is missing, a machine with no hourly cost yet, say, it names it rather than pricing around it. You get a blank and the reason it is blank, not a number. A guess that reads like a quote is worse than no quote.
Can I just ask Jarvis for the price?
Yes. Jarvis is the part of Blitz that talks to you. Tell it the raw material and how fast the job would run, and it gives you the price from the same figures.
Bring an enquiry you turned down.
Book a 20-minute demo and bring a job you passed on, or one you quoted and still wonder about. We price it on your own floor's numbers, in front of you.